This commission was a real test of engineered joinery. The 2.8m tall unit was to replace an existing cabinet that boxed in the boiler. All (over 250) segments where cut in 24mm birch ply and laminated into shelving sections. The bespoke joints where designed to enable the whole unit to slot together in sections, so that we could get it up to the 3rd floor and fitted in a day.